Voyager DP-263-S Podręcznik Użytkownika Strona 127

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 126
Startup and Shutdown
Voyager
Biospectrometry
Workstation User’s Guide 2-49
2
Powering down
the mass
spectrometer
If you need to perform maintenance on internal parts or move
the system, power down the spectrometer:
1. Power down the system components.
2. Turn off the main power switch. The power switch is
located:
On the right side panel of the mass spectrometer
cabinet on Voyager-DE and Voyager-DE PRO
systems.
On the back panel of the mass spectrometer
cabinet on the Voyager-DE STR system.
Przeglądanie stron 126
1 2 ... 122 123 124 125 126 127 128 129 130 131 132 ... 611 612

Komentarze do niniejszej Instrukcji

Brak uwag